Shelling of Poltava Region: «Ukrzaliznytsia» warned about timetable deviations.


As a result of the infrastructure shelling in the Poltava region on August 4, several «Ukrzaliznytsia» trains continue to fall significantly behind the schedule. This was reported on the company's Telegram channel.
Among the trains that deviate from the schedule:
- No. 104/103 Lviv – Kramatorsk with a delay of 5 hours and 10 minutes;
- No. 22/21 Lviv – Kharkiv with a delay of 5 hours and 10 minutes;
- No. 2/1 Ivano-Frankivsk – Kharkiv with a delay of 2 hours and 35 minutes;
- No. 202/201 Vorokhta – Kharkiv with a delay of 2 hours and 35 minutes.
At the same Time, trains 64/63 Lviv – Kharkiv and 112/111 Lviv – Izyum returned to their normal schedule at night.
«The two-group train brought 218 passengers to Kyiv during the curfew, so bus transfers around the city were organized for them, if necessary – the possibility of overnight accommodation or transfer to other routes», – reported «Ukrzaliznytsia».
Recall, on the night of August 4, an air alert was declared in Ukraine due to the threat of enemy Shahed-type attack drones, as well as cruise missiles. Explosions were also reported in Kharkiv and in Myrhorod, Poltava region. In the morning, «Ukrzaliznytsia» reported the shelling of railway infrastructure in the region, causing delays on the Kharkiv direction trains.
Read also
- Prisoner Exchange. The Coordination Headquarters explained why it does not name the number of returned Ukrainians
- Message from captivity. Released soldier called the family of a comrade (video)
- All 'Kinzhal' missiles and most 'Shahed' drones shot down: Air Defense Forces neutralized 479 targets at night
- Storms, tornadoes, and hail: a severe weather struck Ternopil region (video)
- Air raid alert in Kyiv lasted for 11 minutes
- A large-scale air alert in Ukraine lasted 35 minutes