There are installations, there is no money: why Ukrainian cities may remain without light and heat in winter.
29.11.2024
1645

Journalist
Shostal Oleksandr
29.11.2024
1645

Ukraine is facing problems with the installation of gas piston units (GPU) that are supposed to provide backup power supply during outages. According to an expert, only 35 out of 91 GPUs have been installed so far. Many cities do not have the funds to connect this equipment. Even regional centers are facing this issue, as some are not receiving GPUs from the authorities. However, Khmelnytsky managed to solve this problem back in 2009 and successfully uses GPUs during power outages. The expert urges local authorities to allocate funds for communal needs, which will ensure the proper functioning of critical infrastructure even during outages.
Read also
- The Armed Forces have cleared 95% of the village of Bahatyr in Donetsk region
- Checking for Affiliation with the Russian Federation. The Cabinet approved a key document for churches
- Russians are intensifying combat activity in the Vovchansk direction and in the Sumy region
- The Defense Forces improved the tactical position on three key fronts - Naev
- Battles near Kharkiv: occupiers launched an assault on Liptsi with armored vehicles and motorcycles
- A category for documenting damaged non-residential properties has appeared in the Damage Register